Who it is for
Sites growing past 100 MWh a year.
Ausgrid · EA302 · 2026–27
Sites growing past 100 MWh a year.
Sydney, the Central Coast and the Hunter region.
The exact 2026–27 network rates sit side by side. Open a code below for the worked example, the charge window and the checks before you change anything.
| Code | What it is | Status | Access | Energy | Demand / capacity | Export | Battery fit |
|---|---|---|---|---|---|---|---|
| EA302LV 100–160 MWhLow voltage | Metering and access charges, peak/off-peak energy and a kW capacity charge. | Available |
|
|
| — | Strong |
These codes share a charging method. The differences are in the rates, the time bands and who each code is for.
Sites growing past 100 MWh a year.
The capacity charge looks back 12 months, so one big day can set it for a year. A battery that flattens spikes protects you twice over.
Energy rates drop but the capacity charge arrives. Worth it for steady loads, risky for spiky ones.
Open a code for its exact rates, the charge window, a worked example and the checks worth running before you change anything.
Low-voltage sites using 100–160 MWh a year.
You pay fixed and energy charges. The bill also uses the highest kW demand in set periods.
Solar can reduce daytime grid use. If the billed peak occurs after solar output falls, solar alone will not reduce the demand charge.
A battery can reduce a billed peak. It needs enough kW and enough charge for the full event.
These are the network’s charges only. Your retailer adds its own prices on top.
Peak is 3pm–9pm on working weekdays, November–March and June–August only.
3pm–9pm on working weekdays in November–March and June–August. All other times.
50 kW × 48.3397 c/kW/day × 365 days ÷ 100Illustrative network-charge reduction: $8,822.00 a year, excluding GST.This tariff uses the highest qualifying half-hour in the previous 12 months. One lower peak does not remove an earlier maximum.
A guide, not a quote
Strong fit
A recurring peak inside the tariff demand window is a direct battery target. The case weakens if the maximum is rare, unpredictable or longer than the battery can sustain.
Short answers to the things people ask before they change a tariff.
EA302 is the Ausgrid LV 100–160 MWh tariff. It is a available low voltage tariff for Low-voltage sites using 100–160 MWh a year. Metering and access charges, peak/off-peak energy and a kW capacity charge.
The capacity charge looks back 12 months, so one big day can set it for a year. A battery that flattens spikes protects you twice over. For EA302, the battery signal is strong: A recurring peak inside the tariff demand window is a direct battery target. The case weakens if the maximum is rare, unpredictable or longer than the battery can sustain.
The charges are Daily access, Time-of-use energy, kW capacity charge (set by your highest half-hour in the last 12 months). 3pm–9pm on working weekdays in November–March and June–August. All other times. Energy rates drop but the capacity charge arrives. Worth it for steady loads, risky for spiky ones.
Sites growing past 100 MWh a year. The code on your retailer bill is the starting point. Your retailer must confirm any tariff assignment or change.
Effective 1 July 2026 to 30 June 2027. Published network prices exclude GST. These are the network charges only. Your retailer adds its own prices and may package the structure differently.
Reviewed by Mike Anderson · Last verified 7 November 2026
Effective 1 July 2026 to 30 June 2027. Published network prices exclude GST. These are network charges only; your retailer adds its own prices.