- What is power factor, in plain terms?
- Real power (kW) is the electricity that does work. Apparent power (kVA) is what the meter and the network have to carry to deliver it. Power factor is kW divided by kVA, so a site drawing 400 kW while the meter reads 470 kVA is running at 0.85. The gap is reactive power, mostly from motors, compressors, refrigeration and transformers.
- Does power factor correction actually reduce my bill?
- Only where the tariff charges for kVA, or where the network applies a reactive charge. On a kVA-billed code, lower kVA at the same kW means a lower billed maximum, so the daily capacity charge or monthly demand charge falls. On a kW-billed tariff it saves nothing on demand.
- Which NSW tariff codes bill in kVA?
- Several Ausgrid large-business and high-voltage codes (EA305, EA310, EA314, EA315, EA365, EA370, EA390) and the Endeavour Energy large and high-voltage codes (N19, N29, N39) bill demand in c/kVA/day. Essential Energy prices demand in $/kVA/month on its large and high-voltage codes. The table on this page is generated from the current published price-list data, and each code links to its family guide.
- Will a battery reduce the kVA charge?
- Only partly, and only by accident. A battery discharges real power, so it reduces kVA by the amount the power factor allows at that moment. If the site is at 0.85 power factor, a battery sized on kW will not deliver the same reduction in kVA. Correct the reactive load first, then size storage for what is left.
- How much can correction save?
- It depends entirely on the kVA reduction and the published rate. On Endeavour Energy’s N19 high-season rate of 58.421 c/kVA/day, 50 kVA shaved for 31 days is about $905.53 in the network component. On Ausgrid’s EA305 rate of 57.7962 c/kVA/day held over 365 charge days, 62.4 kVA is about $13,169 a year. Capex varies with the site, the harmonic environment and the control gear, so it needs a quote and a power study.
- Does solar make power factor better or worse?
- Neither, on average, and it does not fix a night-time problem. A PV inverter can provide some reactive support if configured to, but it is idle after sunset — and the kVA maximum is often set in the evening. Low-load operation with inverters online can also move the site’s power factor around, which is why correction should be designed against the load profile, not the array.
- Is power factor correction safe to install?
- Installed and commissioned properly, yes — it is standard electrical plant. It must be designed by someone who has seen the load profile and the harmonic distortion, installed by a licensed electrician, and switched in steps so the site does not go leading at light load. Correction equipment interacting badly with harmonics is a design failure, not a product failure.