Who it is for
The single parent meter that on-sells power inside a building: shopping centres, business parks.
Endeavour Energy · N20 · 2026–27
The single parent meter that on-sells power inside a building: shopping centres, business parks.
Western Sydney, the Blue Mountains, Southern Highlands and the Illawarra.
The exact 2026–27 network rates sit side by side. Open a code below for the worked example, the charge window and the checks before you change anything.
| Code | What it is | Status | Access | Energy | Demand / capacity | Export | Battery fit |
|---|---|---|---|---|---|---|---|
| N20LV Seasonal TOU Demand — Embedded NetworkLow voltage | The N19-style seasonal energy and kVA demand structure for an embedded-network parent NMI. | Available |
|
|
| — | Strong |
These codes share a charging method. The differences are in the rates, the time bands and who each code is for.
The single parent meter that on-sells power inside a building: shopping centres, business parks.
Works like N19 at the parent meter. Solar and battery decisions belong at the parent connection, not the child meters.
Open a code for its exact rates, the charge window, a worked example and the checks worth running before you change anything.
Main connections for embedded networks above 160 MWh a year at low voltage.
You pay fixed and energy charges. The bill also uses the highest kVA reading in set periods.
Solar can reduce daytime grid use. If the highest kVA reading occurs after solar output falls, solar alone will not remove it. Solar does not correct poor power factor.
A battery can reduce the active-power part of the kVA peak. Check power factor before you size it.
These are the network’s charges only. Your retailer adds its own prices on top.
Large-demand periods apply. Peak is 16:00–20:00 on business days. All other times are off-peak. Demand is set from a 30-minute interval in the peak period.
50 kVA × 58.421 c/kVA/day × 31 days ÷ 100$905.53 difference in the network demand component for that month.A later parent-meter peak can set a new maximum. Child-meter reductions only help when they reduce the coincident parent peak.
A guide, not a quote
Strong fit
A controlled battery may reduce the site maximum, but the bill is based on apparent power. Power factor and reactive load can be as important as battery kW.
Short answers to the things people ask before they change a tariff.
N20 is the Endeavour Energy LV Seasonal TOU Demand — Embedded Network tariff. It is a available low voltage tariff for Embedded-network parent connections above 160 MWh a year at low voltage. The N19-style seasonal energy and kVA demand structure for an embedded-network parent NMI.
Works like N19 at the parent meter. Solar and battery decisions belong at the parent connection, not the child meters. For N20, the battery signal is strong: A controlled battery may reduce the site maximum, but the bill is based on apparent power. Power factor and reactive load can be as important as battery kW.
The charges are Daily access, Time-of-use energy, kVA demand charge. Large-demand periods apply. Peak is 16:00–20:00 on business days. All other times are off-peak. Demand is set from a 30-minute interval in the peak period.
The single parent meter that on-sells power inside a building: shopping centres, business parks. The code on your retailer bill is the starting point. Your retailer must confirm any tariff assignment or change.
Effective 1 July 2026. The source includes GST-exclusive and GST-inclusive tables. These are the network charges only. Your retailer adds its own prices and may package the structure differently.
Reviewed by Mike Anderson · Last verified 7 November 2026