Who it is for
Bigger low-voltage sites: factories, cold stores, large facilities.
Endeavour Energy · N19 · 2026–27
Bigger low-voltage sites: factories, cold stores, large facilities.
Western Sydney, the Blue Mountains, Southern Highlands and the Illawarra.
The exact 2026–27 network rates sit side by side. Open a code below for the worked example, the charge window and the checks before you change anything.
| Code | What it is | Status | Access | Energy | Demand / capacity | Export | Battery fit |
|---|---|---|---|---|---|---|---|
| N19Low Voltage Seasonal TOU DemandLow voltage | Daily access, seasonal time-of-use energy rates and seasonal peak demand charges in kVA. | Default |
|
|
| — | Strong |
These codes share a charging method. The differences are in the rates, the time bands and who each code is for.
Bigger low-voltage sites: factories, cold stores, large facilities.
Solar trims daytime energy. A battery can shave the kVA peak, but the peak runs to 8pm — keep charge in reserve — and poor power factor needs fixing first.
Crossing 160 MWh a year drops the energy rates but adds the kVA charge. Check both sides of that trade before assuming either way.
Open a code for its exact rates, the charge window, a worked example and the checks worth running before you change anything.
Businesses connected at low voltage using more than 160 MWh a year with interval and demand metering.
You pay fixed and energy charges. The bill also uses the highest kVA reading in set periods.
Solar can reduce daytime grid use. If the highest kVA reading occurs after solar output falls, solar alone will not remove it. Solar does not correct poor power factor.
A battery can reduce the active-power part of the kVA peak. Check power factor before you size it.
These are the network’s charges only. Your retailer adds its own prices on top.
Peak is business days only. All other times are off-peak.
Peak is 16:00–20:00 on business days. All other times are off-peak. The same clock times apply in standard time and daylight saving time. Demand is set from the highest 30-minute kVA reading in the peak period.
50 kVA × 58.421 c/kVA/day × 31 days ÷ 100$905.53 difference in the N19 network demand component for that month.A later peak can set a new maximum. Check power factor. This is not a retail saving.
A guide, not a quote
Strong fit
A controlled battery may reduce the site maximum, but the bill is based on apparent power. Power factor and reactive load can be as important as battery kW.
Short answers to the things people ask before they change a tariff.
N19 is the Endeavour Energy Low Voltage Seasonal TOU Demand tariff. It is a default low voltage tariff for Low-voltage business sites using more than 160 MWh a year with interval and demand metering. Daily access, seasonal time-of-use energy rates and seasonal peak demand charges in kVA.
Solar trims daytime energy. A battery can shave the kVA peak, but the peak runs to 8pm — keep charge in reserve — and poor power factor needs fixing first. For N19, the battery signal is strong: A controlled battery may reduce the site maximum, but the bill is based on apparent power. Power factor and reactive load can be as important as battery kW.
The charges are Daily access, Time-of-use energy, kVA demand charge (highest half-hour, 4–8pm business days). Peak is 16:00–20:00 on business days. All other times are off-peak. The same clock times apply in standard time and daylight saving time. Demand is set from the highest 30-minute kVA reading in the peak period. Crossing 160 MWh a year drops the energy rates but adds the kVA charge. Check both sides of that trade before assuming either way.
Bigger low-voltage sites: factories, cold stores, large facilities. The code on your retailer bill is the starting point. Your retailer must confirm any tariff assignment or change.
Effective 1 July 2026. The source includes GST-exclusive and GST-inclusive tables. These are the network charges only. Your retailer adds its own prices and may package the structure differently.
Reviewed by Mike Anderson · Last verified 7 November 2026
Effective 1 July 2026. The source includes GST-exclusive and GST-inclusive tables. These are network charges only; your retailer adds its own prices.