Endeavour Energy small business tariffs

Endeavour Energy · N90, N91, N92, N93, N89 · 2026–27

Most Endeavour Energy small businesses: workshops, shops, small warehouses.

Western Sydney, the Blue Mountains, Southern Highlands and the Illawarra.

Compare the small business codes.

The exact 2026–27 network rates sit side by side. Open a code below for the worked example, the charge window and the checks before you change anything.

Endeavour Energy small business tariff codes, 2026–27 network prices
CodeWhat it isStatusAccessEnergyDemand / capacityExportBattery fit
N90General Supply BlockLow voltageDaily access plus two quarterly energy blocks, split at 30,000 kWh per quarter.Available
Daily
108.77031 c/day
Block 1
13.83283 c/kWh
Block 2
16.51133 c/kWh
——Weak
N91General Supply Seasonal Time of UseLow voltageDaily access plus high-season peak, low-season peak, solar-soak and off-peak energy rates.Default
Daily
108.77031 c/day
High-season peak
27.67072 c/kWh
Low-season peak
18.60353 c/kWh
Solar soak
5.68656 c/kWh
Off-peak
14.78631 c/kWh
——Conditional
N92General Supply DemandLow voltageDaily access, solar-soak and other energy rates, plus seasonal peak demand charges in kW.Optional
Daily
108.77031 c/day
Solar soak
5.68656 c/kWh
Other energy
14.09155 c/kWh
High-season demand
26.598 c/kW/day
Low-season demand
13.112 c/kW/day
—Strong
N93General Supply Transitional DemandLow voltageDaily access, solar-soak and other energy rates, plus transitional seasonal peak demand charges in kW.Transitional
Daily
108.77031 c/day
Solar soak
5.68656 c/kWh
Other energy
14.66333 c/kWh
High-season demand
23.936 c/kW/day
Low-season demand
11.803 c/kW/day
—Strong
N89LV Seasonal TOU TransitionalLow voltageDaily access plus seasonal peak and off-peak energy rates, without the N19 demand component.Transitional
Daily
2655.4 c/day
High-season peak
21.45077 c/kWh
Low-season peak
18.29388 c/kWh
Off-peak
11.22506 c/kWh
——Weak

What this family covers.

These codes share a charging method. The differences are in the rates, the time bands and who each code is for.

Who it is for

Most Endeavour Energy small businesses: workshops, shops, small warehouses.

What is on the bill

  • Daily access
  • Time-of-use energy
  • Peak demand charge (N92/N93 only)

Solar and battery

Solar cuts your daytime units, which are the dearer ones. A battery matters most on N92 and N93, where flattening your peak also cuts the demand charge.

Worth asking about

Most sites sit on N91, the default. Steady usage? Ask about N90’s block rates. Predictable 4–8pm peak? Ask about N92/N93. Your retailer decides, so ask them.

The codes in detail.

Open a code for its exact rates, the charge window, a worked example and the checks worth running before you change anything.

N90General Supply BlockBusinesses connected at low voltage using less than 160 MWh a year.Available · Low voltage

N90 General Supply Block

Who it’s for

Businesses connected at low voltage using less than 160 MWh a year.

What you pay

You pay a daily charge. The energy rate changes after the site passes a quarterly usage block.

If you get solar

Solar reduces the electricity the site buys. The network gives no special reward for using solar at a set time.

If you get a battery

This tariff gives a battery no clear network target. Check retailer prices, solar exports and backup needs.

Check before you decide

  • Confirm this code on a current retailer bill.
  • Use the retailer prices, not only the network price list.
  • Measure the energy that can move between time periods.
2026–27 network prices

What it costs, and when

These are the network’s charges only. Your retailer adds its own prices on top.

What the network charges

Daily
108.77031 c/day
Block 1
13.83283 c/kWh
Block 2
16.51133 c/kWh

When the rates apply

The second block starts after 30,000 kWh in a quarter.

Illustrative example

Avoid part of the N90 second block

  • A quarter has 130,000 kWh of grid imports.
  • A project removes 10,000 kWh from that quarter.
  • All 10,000 kWh would otherwise be in Block 2.
10,000 kWh × 16.51133 c/kWh ÷ 100$1,651.13 less in the network energy component for that quarter.

This is not a retail-bill saving quote. Check how the retailer passes through network charges.

Would a battery help?

A guide, not a quote

Weak fit

Retailer-led value only

This network tariff does not provide a clear demand or time-window target for a behind-the-meter battery. Any case must come from the retailer spread, solar capture or resilience value.

A battery can reduce these

  • Grid energy purchases where stored solar would otherwise be exported.
  • Retailer time-of-use or wholesale exposure if the retail contract differs from the network structure.

A battery can’t change these

  • Daily access, metering and other fixed charges.
  • A network demand charge that is not present on this tariff.
  • Quarterly block thresholds or closed/transitional tariff rules through dispatch alone.

You’d need to check

  1. Current retailer bill and complete retail rate schedule.
  2. At least 12 months of interval imports and solar exports.
  3. Eligible alternative network and retailer tariffs.
  4. Resilience requirements valued separately from bill savings.
N91General Supply Seasonal Time of UseBusinesses connected at low voltage, generally below 160 MWh a year.Default · Low voltage

N91 General Supply Seasonal Time of Use

Who it’s for

Businesses connected at low voltage, generally below 160 MWh a year.

What you pay

You pay different energy rates at different times. Check the current time periods and seasonal rules.

If you get solar

Solar reduces grid use while it is generating. Its value depends on the energy rate at that time.

If you get a battery

A battery can move energy to a more expensive period. Use actual retailer prices and allow for battery losses.

Check before you decide

  • Confirm this code on a current retailer bill.
  • Use the retailer prices, not only the network price list.
  • Measure the energy that can move between time periods.
2026–27 network prices

What it costs, and when

These are the network’s charges only. Your retailer adds its own prices on top.

N91 in one day

Solar soak runs every day. Peak is business days only.

What the network charges

Daily
108.77031 c/day
High-season peak
27.67072 c/kWh
Low-season peak
18.60353 c/kWh
Solar soak
5.68656 c/kWh
Off-peak
14.78631 c/kWh

When the rates apply

Solar soak is 10am–2pm every day. Peak is 4pm–8pm on business days.

Illustrative example

Move N91 energy out of a summer peak

  • Move 1,000 kWh from high-season peak to solar-soak time.
  • Ignore battery losses and degradation.
  • Use GST-inclusive network rates.
1,000 kWh × (27.67072 − 5.68656) c/kWh ÷ 100$219.84 difference in the network energy component.

The customer may not receive this spread. Use the retail contract for an investment model.

Would a battery help?

A guide, not a quote

Conditional fit

Time-of-use load shifting

The tariff provides a time-window signal rather than a demand target. Battery value depends on a repeatable price spread, sufficient cycling volume and a control system that preserves energy for the expensive window.

A battery can reduce these

  • Peak-period grid imports shifted into a cheaper network or retailer window.
  • Solar generation carried into later business load.
  • Retailer energy exposure where its time periods align with battery dispatch.

A battery can’t change these

  • Daily access, metering and other fixed charges.
  • A network demand charge where none is included in this tariff.
  • Energy already consumed directly from solar without incurring battery losses.

You’d need to check

  1. At least 12 months of interval usage and export data grouped by tariff window.
  2. Both retailer and network time periods and rates.
  3. Solar production, operating hours and seasonal load changes.
  4. Round-trip efficiency, usable capacity, cycling and degradation assumptions.
N92General Supply DemandEligible businesses connected at low voltage using less than 160 MWh a year.Optional · Low voltage

N92 General Supply Demand

Who it’s for

Eligible businesses connected at low voltage using less than 160 MWh a year.

What you pay

You pay fixed and energy charges. The bill also uses the highest kW demand in set periods.

If you get solar

Solar can reduce daytime grid use. If the billed peak occurs after solar output falls, solar alone will not reduce the demand charge.

If you get a battery

A battery can reduce a billed peak. It needs enough kW and enough charge for the full event.

Check before you decide

  • Confirm this code on a current retailer bill.
  • Use 12 months of interval data. Check the time of each billed peak.
  • Check the battery power in kW against the full peak event.
2026–27 network prices

What it costs, and when

These are the network’s charges only. Your retailer adds its own prices on top.

N92 in one day

Peak is business days only. All other times are off-peak.

What the network charges

Daily
108.77031 c/day
Solar soak
5.68656 c/kWh
Other energy
14.09155 c/kWh
High-season demand
26.598 c/kW/day
Low-season demand
13.112 c/kW/day

When the rates apply

Demand is set by the highest 30-minute reading from 4pm–8pm on a business day.

Illustrative example

Reduce an N92 summer demand peak

  • The project cuts the billed peak by 50 kW.
  • The reduction holds for the full 30-minute peak interval.
  • The month has 31 days.
  • Use the N92 high-season rate.
50 kW × 26.598 c/kW/day × 31 days ÷ 100$412.27 difference in the N92 network demand component for that month.

A later peak can set a new billed maximum. N93 has a different rate.

Would a battery help?

A guide, not a quote

Strong fit

Peak-demand shaving

A recurring peak inside the tariff demand window is a direct battery target. The case weakens if the maximum is rare, unpredictable or longer than the battery can sustain.

A battery can reduce these

  • The highest measured kW inside the tariff demand window.
  • Peak-period grid energy when the battery discharges at the same time.
  • Solar spill that can be stored without sacrificing the required peak reserve.

A battery can’t change these

  • Daily access, metering and other fixed charges.
  • A peak outside the defined demand window where the tariff does not count it.
  • A new maximum created after the battery empties or misses dispatch.

You’d need to check

  1. At least 12 months of interval data, including every billed maximum.
  2. Demand timestamps, seasonal windows and billing reset rules.
  3. Battery power and duration tested against the full peak event.
  4. Retailer rates plus the network tariff—not a blended cents-per-kWh assumption.
N93General Supply Transitional DemandExisting eligible low-voltage business customers transitioning toward the standard demand tariff.Transitional · Low voltage

N93 General Supply Transitional Demand

Who it’s for

Existing eligible low-voltage business customers transitioning toward the standard demand tariff.

What you pay

You pay fixed and energy charges. The bill also uses the highest kW demand in set periods.

If you get solar

Solar can reduce daytime grid use. If the billed peak occurs after solar output falls, solar alone will not reduce the demand charge.

If you get a battery

A battery can reduce a billed peak. It needs enough kW and enough charge for the full event.

Check before you decide

  • Confirm this code on a current retailer bill.
  • Use 12 months of interval data. Check the time of each billed peak.
  • Check the battery power in kW against the full peak event.
  • Model the tariff that will replace this temporary tariff.
2026–27 network prices

What it costs, and when

These are the network’s charges only. Your retailer adds its own prices on top.

N93 in one day

Solar soak runs every day. Peak is business days only.

What the network charges

Daily
108.77031 c/day
Solar soak
5.68656 c/kWh
Other energy
14.66333 c/kWh
High-season demand
23.936 c/kW/day
Low-season demand
11.803 c/kW/day

When the rates apply

Solar soak is 10:00–14:00 every day. Peak is 16:00–20:00 on business days. Demand is set from the highest 30-minute kW reading in the peak period. High season is November–March. Low season is April–October.

Illustrative example

Reduce an N93 summer demand peak

  • The project cuts the billed peak by 50 kW.
  • The reduction holds for the full 30-minute peak interval.
  • The month has 31 days.
  • Use the N93 high-season network rate.
50 kW × 23.936 c/kW/day × 31 days ÷ 100$371.01 difference in the N93 network demand component for that month.

A later peak can set a new billed maximum. This is not a retail saving. Confirm the transition path and retailer pass-through.

Would a battery help?

A guide, not a quote

Strong fit

Peak-demand shaving

A recurring peak inside the tariff demand window is a direct battery target. The case weakens if the maximum is rare, unpredictable or longer than the battery can sustain.

A battery can reduce these

  • The highest measured kW inside the tariff demand window.
  • Peak-period grid energy when the battery discharges at the same time.
  • Solar spill that can be stored without sacrificing the required peak reserve.

A battery can’t change these

  • Daily access, metering and other fixed charges.
  • A peak outside the defined demand window where the tariff does not count it.
  • A new maximum created after the battery empties or misses dispatch.

You’d need to check

  1. At least 12 months of interval data, including every billed maximum.
  2. Demand timestamps, seasonal windows and billing reset rules.
  3. Battery power and duration tested against the full peak event.
  4. Retailer rates plus the network tariff—not a blended cents-per-kWh assumption.
N89LV Seasonal TOU TransitionalSelected businesses above 160 MWh that meet N19 criteria but lack demand-capable metering.Transitional · Low voltage

N89 LV Seasonal TOU Transitional

Who it’s for

Selected businesses above 160 MWh that meet N19 criteria but lack demand-capable metering.

What you pay

You pay fixed charges and an energy rate. This tariff has no demand charge.

If you get solar

Solar reduces the electricity the site buys. The network gives no special reward for using solar at a set time.

If you get a battery

This tariff gives a battery no clear network target. Check retailer prices, solar exports and backup needs.

Check before you decide

  • Confirm this code on a current retailer bill.
  • Use the retailer prices, not only the network price list.
  • Measure the energy that can move between time periods.
  • Model the tariff that will replace this temporary tariff.
2026–27 network prices

What it costs, and when

These are the network’s charges only. Your retailer adds its own prices on top.

N89 in one day

Peak is business days only. All other times are off-peak.

What the network charges

Daily
2655.4 c/day
High-season peak
21.45077 c/kWh
Low-season peak
18.29388 c/kWh
Off-peak
11.22506 c/kWh

When the rates apply

Peak is 16:00–20:00 on business days. All other times are off-peak. High season is November–March. Low season is April–October. The same clock times apply in standard time and daylight saving time.

Illustrative example

Move N89 energy out of a summer peak

  • Move 1,000 kWh from high-season peak to off-peak time.
  • Use GST-inclusive network rates.
  • Ignore battery losses and project costs.
1,000 kWh × (21.45077 − 11.22506) c/kWh ÷ 100$102.26 difference in the network energy component.

N89 is transitional and has no demand charge. This is not a retail saving. Confirm the replacement tariff and retailer pass-through.

Would a battery help?

A guide, not a quote

Weak fit

Retailer-led value only

This network tariff does not provide a clear demand or time-window target for a behind-the-meter battery. Any case must come from the retailer spread, solar capture or resilience value.

A battery can reduce these

  • Grid energy purchases where stored solar would otherwise be exported.
  • Retailer time-of-use or wholesale exposure if the retail contract differs from the network structure.

A battery can’t change these

  • Daily access, metering and other fixed charges.
  • A network demand charge that is not present on this tariff.
  • Quarterly block thresholds or closed/transitional tariff rules through dispatch alone.

You’d need to check

  1. Current retailer bill and complete retail rate schedule.
  2. At least 12 months of interval imports and solar exports.
  3. Eligible alternative network and retailer tariffs.
  4. Resilience requirements valued separately from bill savings.

Questions about small business tariffs.

Short answers to the things people ask before they change a tariff.

What is N90?

N90 is the Endeavour Energy General Supply Block tariff. It is a available low voltage tariff for Low-voltage non-residential sites using less than 160 MWh a year. Daily access plus two quarterly energy blocks, split at 30,000 kWh per quarter.

What is N91?

N91 is the Endeavour Energy General Supply Seasonal Time of Use tariff. It is a default low voltage tariff for Low-voltage non-residential sites, generally below 160 MWh a year. Daily access plus high-season peak, low-season peak, solar-soak and off-peak energy rates.

What is N92?

N92 is the Endeavour Energy General Supply Demand tariff. It is a optional low voltage tariff for Eligible low-voltage non-residential sites using less than 160 MWh a year. Daily access, solar-soak and other energy rates, plus seasonal peak demand charges in kW.

What is N93?

N93 is the Endeavour Energy General Supply Transitional Demand tariff. It is a transitional low voltage tariff for Existing eligible low-voltage business customers transitioning toward the standard demand tariff. Daily access, solar-soak and other energy rates, plus transitional seasonal peak demand charges in kW.

What is N89?

N89 is the Endeavour Energy LV Seasonal TOU Transitional tariff. It is a transitional low voltage tariff for Selected sites above 160 MWh that meet N19 criteria but lack demand-capable metering. Daily access plus seasonal peak and off-peak energy rates, without the N19 demand component.

Can solar or a battery reduce a small business bill?

Solar cuts your daytime units, which are the dearer ones. A battery matters most on N92 and N93, where flattening your peak also cuts the demand charge. For N90, the battery signal is weak: This network tariff does not provide a clear demand or time-window target for a behind-the-meter battery. Any case must come from the retailer spread, solar capture or resilience value.

How do the small business network charges work?

The charges are Daily access, Time-of-use energy, Peak demand charge (N92/N93 only). The second block starts after 30,000 kWh in a quarter. Most sites sit on N91, the default. Steady usage? Ask about N90’s block rates. Predictable 4–8pm peak? Ask about N92/N93. Your retailer decides, so ask them.

Which Endeavour Energy small business code applies to my site?

Most Endeavour Energy small businesses: workshops, shops, small warehouses. The code on your retailer bill is the starting point. Your retailer must confirm any tariff assignment or change.

Are these network prices or retail prices?

Effective 1 July 2026. The source includes GST-exclusive and GST-inclusive tables. These are the network charges only. Your retailer adds its own prices and may package the structure differently.

Reviewed by Mike Anderson · Last verified 7 November 2026

Effective 1 July 2026. The source includes GST-exclusive and GST-inclusive tables. These are network charges only; your retailer adds its own prices.

Free instant check

Put a number on your own roof.

We develop NSW commercial solar projects and introduce you to one installer we would use for that site. It starts here: type an address and we map the actual building live — about ten seconds, no email, no bill upload.

Check your roof