BHND4LS — HV Storage / Hybrid

Essential Energy · Available · High voltage · 2026–27

Regional, rural and remote NSW, including most areas outside the major coastal networks.

BHND4LS HV Storage / Hybrid tariff guide

Who it’s for

New high-voltage storage or hybrid connections with no co-located load.

What you pay

This tariff is for a separate battery or hybrid connection. It is not for a normal business load.

If you get solar

Do not use this tariff to assess solar that shares a meter with normal business equipment.

If you get a battery

Treat this as a specialist connection project. The connection design and market contract control the result.

Check before you decide

  • Confirm this code on a current retailer bill.
  • Check the connection approval, export limit and protection design.
  • Get an engineering review before you select equipment.
2026–27 network prices

What it costs, and when

These are the network’s charges only. Your retailer adds its own prices on top.

What the network charges

Access
$27.4319/day
Peak import demand
$12.5825/kVA/month
Shoulder import demand
$11.2496/kVA/month
Off-peak import demand
$3.8099/kVA/month
Daytime export charge above 1.5 kW
$0.985/kW/month · 10am–3pm

When the rates apply

Import demand uses the storage time bands. The 2026–27 list also publishes an HV daytime export demand charge.

Illustrative example

Classify a 500 kW HV storage project

  • The new battery connects to the high-voltage distribution network.
  • Its rated power is 500 kW.
  • Only ancillary load shares the meter.
The published tariff path is BHND4LS because the connection is high voltage. The LV storage codes do not apply.

The example uses a project above 250 kW, but voltage is the key distinction from BLND4LS. Confirm the connection offer.

Would a battery help?

A guide, not a quote

Specialist fit

Dedicated storage dispatch

This code is designed for a storage or hybrid connection, not proof that a battery suits an ordinary business load behind the existing meter.

A battery can reduce these

  • Time-varying storage import or export components published for the dedicated connection.
  • Market or retailer value where the connection and operating agreement allow it.

A battery can’t change these

  • The bill of a separate business load that is not connected behind this meter.
  • Connection, protection, augmentation and market-access costs.

You’d need to check

  1. Connection application, export envelope and network study.
  2. Half-hourly import and export dispatch model.
  3. Retailer, market-access and aggregation terms.
  4. Battery degradation, availability and round-trip efficiency assumptions.