Essential Energy · Default · Sub-transmission · 2026–27
Regional, rural and remote NSW, including most areas outside the major coastal networks.
BSSD3AO Sub-transmission Demand tariff guide
Who this is for
Connections supplied at Essential Energy sub-transmission voltage.
How the bill works
You pay fixed and energy charges. The bill also uses the highest kVA reading in set periods.
What solar changes
Solar can reduce daytime grid use. If the highest kVA reading occurs after solar output falls, solar alone will not remove it. Solar does not correct poor power factor.
What a battery changes
A battery can reduce the active-power part of the kVA peak. Check power factor before you size it.
Check before you model
Confirm this code on a current retailer bill.
Use 12 months of interval data. Check the time of each billed peak.
Get kW, kVA and power-factor data from the billing meter.
Get an engineering review before you select equipment.
2026–27 network schedule
The price signal behind this code
Network rates only. These are not retail electricity prices.
Published network rates
Access
$27.2302/day
Peak energy
6.7409 c/kWh
Shoulder energy
3.9788 c/kWh
Off-peak energy
3.2959 c/kWh
Peak demand
$4.4388/kVA/month
Shoulder demand
$3.1645/kVA/month
Off-peak demand
$1.2614/kVA/month
When it applies
On weekdays, off-peak is 12am–7am, shoulder is 7am–10am, peak is 10am–3pm, shoulder is 3pm–5pm, peak is 5pm–8pm, shoulder is 8pm–10pm, and off-peak is 10pm–12am. Weekends are off-peak. Interval meters use daylight saving time. The tariff uses a separate monthly half-hour kVA maximum in each band.
Illustrative example
Reduce the sub-transmission peak by 50 kVA
The peak-band maximum falls by 50 kVA.
Other demand bands do not change.
The site does not use a negotiated price.
The peak demand charge falls by about $221.94 for that month: 50 × $4.4388.
Sites above 10 MW or 40 GWh a year may have site-specific arrangements. Confirm the actual contract.
Battery opportunity lens
Tariff screen—not a savings quote
Strong fit
Peak-kVA control
A controlled battery may reduce the site maximum, but the bill is based on apparent power. Power factor and reactive load can be as important as battery kW.
What dispatch can affect
The active-power contribution to the measured kVA maximum.
Peak-period grid energy when the battery discharges at the same time.
Solar spill that can be stored without sacrificing the required peak reserve.
What it cannot erase
Daily access, metering and other fixed charges.
Reactive-power demand unless the inverter and control design explicitly provide power-factor support.
A new maximum created after the battery empties or misses dispatch.
Evidence required
At least 12 months of interval data, including every billed maximum.
Demand timestamps, seasonal windows and billing reset rules.
kW, kVA, kvar and power-factor data at the billing meter.
Retailer rates plus the network tariff—not a blended cents-per-kWh assumption.